Coromandel/Firth of Thames Integrated Coastal Planning
1. Identification information
Status
Complete
Data Collection Date
Summary
The study explores what has been termed a local coastal planning (LCP) model. This model is characterised by resource management agencies making joint management plans, which cover multiple jurisdictions, which encompass both the land and sea of the coastal environment, and are at a scale, which is locally relevant for particular areas of the coast.
The Coromandel/Firth of Thames is an extensive geographic area. There is approximately 880km of coastline, including approximately 200km of islands. This area is characterised by unique settlements, diverse natural and physical resources, important values and a wide range of pressures on the coastal environment.
The integrated coastal planning (ICP) scoping study is not a detailed assessment of site-specific issues, rather it is an exploration of a model for integrated planning and management of the coastal environment as well as an initial analysis of the key issues within the area and identification of potential information gaps.
Environment Waikato has commissioned a study to explore with other resource management agencies in the east coast of the Waikato region (Coromandel/Firth of Thames) a framework for integrated planning for the use, development and protection of the coastal environment.
Content
Table of Contents:
Executive summary
2 Introduction
2.1 Study purpose
2.2 Study area
2.3 Format of report
3 Coastal management
3.1 Statutory coastal management
3.2 Strategic coastal planning
3.3 Integrated coastal management
3.4 Local coastal planning model
4 Lessons learned
4.1 Summary of lessons for ICP project
5 A strategic planning framework for integrated coastal planning
6 Coromandel/Firth of Thames
6.1 Overview
6.2 Population growth and demand
6.3 Resource use and development
6.4 Infrastructure
6.5 Natural character/landscape
6.6 Natural heritage/biodiversity
6.7 Community well-being/sense of place/heritage
6.8 Recreation/access
6.9 Cultural values
6.10 Environmental quality
6.11 Coastal hazards
7 Sub-catchments
7.1 Overview
7.2 The plains and southern Firth
7.3 Firth of Thames and western Coromandel
7.4 Northern tip of the peninsula
7.5 North-eastern coast
8 Cluster policy areas
9 Local coastal planning areas
9.1 Local coastal plans
9.2 LCP area identification
9.3 Prioritisation of LCP areas
10 Recommended way forward
10.1 Preferred strategy approach
10.2 Suggested governance approach
10.3 Addressing information gaps
11 Work plan
11.1 Work plan: Stage one (total three months)
11.2 Work plan: Stage two (total 24-36 months)
12 Acknowledgements
Appendix 1 - Project linkages
Appendix 2 - ICP position statements
Appendix 3 - LCP area descriptions
Appendix 4 - Example of LCP area concept map
Appendix 5 - Bibliography
Study Types
- Unknown
- Literature Review
Categories
- Consents and Structures
- Social and Economic
- Coastal Hazards
- Coastal Development and Public Spaces
- Marine Protection
- Invasive Species/Weeds
- Aquaculture
- Consents and Structures
- Consents and Structures
2. Contact information
Commissioning Agencies
- Environment Waikato
Contact Organisations
- Environment Waikato
3. Spatial information
Geographic Coverage
Coromandel Peninsula and Firth of Thames
Grid Coordinates
Locations
-
NameEast coast of Waikato RegionNZMG Easting0NZMG Northing0LocationEast Coast
4. Data acquisition information
Collection Date
2005-2006
Methodology
Frequency of collection:
n/a
5. Data quality information
Known Limitations
n/a
Gaps in collection:
n/a
Data quality:
n/a
Attribute accuracy:
n/a
Completeness:
n/a
6. Distribution information
Format
Report available in printed (for a charge) or electronic form from Environment Waikato
Applications
Availability
Freely available.
Sensitivity/Confidentiality:
No confidentiality, publicly available.
7. Status information
Data Status
Work is ongoing.
8. Metadata information
General Notes
Related Links
Publications
- Beca Carter Hollings & Ferner Ltd. 2006: Coromandel/Firth of Thames Integrated Coastal Planning Project. Environment Waikato Technical Report TR 2006/12. 130 p.
Related Publications
Related Datasets
9. Related files
No files have been attached to this dataset